Placeholder for Wallace & Tiernan right col
History back
Wallace & Tiernan Taking care of the world's water
Homepage of Wallace & Tiernan
Placeholder for Wallace & Tiernan right col
Hellblaue Linie
Dunkelgraue Linie
More informations hereVersion francaisDeutsche VersionLoginHelp
 Process Technology Analysers/Controllers Datamanagement Gas Feeders Metering Pumps Dry Volumetric Feeders RechterAbschluss
V10k manual
V10k manual

V10k automatic
V10k automatic


Gas Feeders

V-2020
V-2020
E-2000
E-2000
For many decades chlorine gas has been the predominant chemical for the disinfection of water.
The most economic disinfectant is available as gaseous or liquid chlorine supplied in cylinders or ton containers. Using a remote vacuum operated gas feeder a chlorine solution is prepared on site from chlorine gas and water. This solution is used as disinfectant.

Wallace & Tiernan chlorinators operate to the all-vacuum principle, this means there is vacuum from the cylinder up to the injector.

The full vacuum gas feeder V10k and the other models can also be used for metering carbon dioxide (CO2) for lowering the pH and for hardwater conditions of potable water. The full vacuum gas feeders are also suitable for sulphur dioxide (SO2) for dechlorination applications and for ammonia (NH3). The gas feed system V10k is designed for capacities up to 15 kg/h of chlorine gas and the gas feed system S10k comprising of a vacuum regulator, a gas control unit and an injector for capacities up to 10 kg/h.


For higher capacities the chlorinators V-2020 (up to 60 kg/h) and V-2030 (up to 200 kg/h) are available, thus covering any capacity to meet any requirement.

For capacities above 60 kg/h Cl2 a liquid chlorine evaporator (E 2000) should be used.

The worldwide proven Wallace & Tiernan V-notch gas flow control technology provides a wide range and very high repeatability. Control of the gas feed rate can be manual or automatic via an electric positioner.

As optional accessories automatic chlorine cylinder change-over units in various capacities are available. By switching over from empty to full chlorine containers an uninterrupted gas supply is provided.


 Technical Details
Click hereV-2020/V-2030 PDF
Click hereV10k PDF
Click hereS10k PDF
Click hereE-2000 PDF
Click hereV-015, A-015, AU-015
Automatic changeover modules with CCU control unit PDF

Click hereBrochure V10k Gas Feed System PDF

Click hereInstruction Manuals Login
New:
Click hereSFC series
Click here2010, September 13th - 17th: IFAT, Munich - Germany
 Services
Click hereWallace & Tiernan general programPDF
Click hereProducts and Processes - Providing pool pleasure and wellness feelingPDF
Click hereUV Water Treatment Technology PDF
Click herePreventing and Eliminating LegionellaePDF
Click hereWallace & Tiernan worldwide
Click hereWallace & Tiernan partner in Europe
Click hereField-Engineers-Germany

Click herePressure Sensitive Instruments: Partners

Download-Area: Instruction manuals
last update: February, 25th, 2010

Click hereLogin (password protected) Login
Click hereRegister here

SIEMENS
Sitemap zu dieser Website About